Thursday, February 7, 2013
Upstairs Railing
Progress is currently being made on the stairway and the upstairs walkway. We now have a railing on the walkway, but the bannister rail is still being shaped for the actual stairs, so we several days away from getting the full railing up.
The big thing that still seems to be slowing down the progress is the sealing of the first floor windows. I know I have talked about this before, but this needs to be a chief concern of anyone contemplating building a Monolithic Dome. It is apparent to me that sealing windows is a main problem on many domes. As of now, 4 months after they were first installed, the first floor windows still leak, despite 4 or 5 attempts to properly seal them.