Friday, April 27, 2012

Initial Electrical is done

Electrical Slab, Running conduit for electrical in the slabThe electricians have finished setting up the in slab electrical and things should be all ready for them to come in on Monday and start finishing the preparations for the pouring of the slab. This involves cleaning up the ring beam footing, digging the main wall beams, and placing the rebar as needed.

The local utility company will be coming out next week to connect power to the temporary pole they set and we will then have power on-site. This has to happen before the airform can be inflated, so it will probably be next Friday or maybe even Saturday before we can inflate the airform and start building the dome shell proper. It seems so close and yet so far away at the same time. Once that goes up, the site view won't be changing much over time and my pictures will have to be interior pictures where things are actually happening.

Stay tuned and we'll have the actual inflation schedule posted in a few days (I hope).

1 comment:

Note: Only a member of this blog may post a comment.