Wednesday, December 28, 2011
Site Visit by Monolithic Domes
Before I start this actual post, I wanted to share the picture of the soil sample being taken a few weeks ago. Gessner Engineering has this machine on tracks which they take on the site and drill a 20 foot deep hole and take soil samples every 2 feet. I am hoping to get the report this week or next and get on with the design of the foundation.
We have scheduled the people from Monolithic Domes to come down and look at our site and do a site evaluation to be able to complete the floor plans. They need to see where the house will be located, where the water line will come in, where the septic system will be located, etc. Also they will need to make sure their work crews and equipment can access the site and if not, what we need to do to make it accessible. They will be coming in this Friday, December 30th. Once we get this visit completed I hope we can start making steady progress toward completing the home over the summer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.