It's been a while since I have posted here. This is due to many factors not related to the house. Just remember that everyone has episodes that consume a lot of time that can't be controlled.

The sheetrock is completely up in the main house (well 99+%) and mostly done in the other dome.  All the electrical, plumbing, and HVAC is done for the time being. The pool has been dug out and there bar laid. Things seem to be getting back to a regular schedule,just way behind the initial proposal.  The revised move in date is over two months later than initial estimates.  I suppose that is not to bad in the grand scheme of things, but it is annoying. We had hoped to be in for Christmas but it is looking more like spring break now.

Tomorrow is supposed to bring the spraying of the pool in concrete ( gunnite actually).  This will make it look more like a pool and less like we have a big gopher problem :-) .